Massive volumes of biowaste are produced, accompanied by exorbitant collection fees.
Keyword: 100$/day
Prolonged waiting periods for waste treatment with significant risks of foul-smelling gas and wastewater leakage
Keyword: Messy and Poor
Traditional composting equipment requires a long treatment duration, and absence of ways for subsequent recycling and utilization of fertilizer.
Keyword: 7-14 days
>It is recommended to use the sorted kitchen biowaste, biodegradable waste and other algriculture waste.
>For large-scale waste (e.g. branches and timber), it is advisable to crush them into <10cm small pieces in advance.
>For the waste that can be subjected to composting treatment, please refer to the standard requirements of ECN.
>Model FC100 and above support automatic feeding of garbage collection bins, while the FC50 model only supports manual feeding.
>Additional or midway feeding is acceptable at any time during the composting period.
>The system will operate automatically according to the preset or user-defined settings (temperature & duration).
>Users can remotely monitor the equipment operation status while equipped with data transmission module.
>No manual intervention is required during the composting process.
>Open the discharging port to recycle the composted residual materials.
>It is recommended to discharge with a conveyor belt or a vibrating sieve.
>The volume of the residual materials after composting will be reduced by 80-90%, and they can be recycled as a municipal waste.
>Residual materials which meet the requirements of ECN and CE can be recycled as fertilizers (PFC-1), soil conditioners (PFC-3), or growing media (PMF-4).
>The residual materials can be used as combustible materials to supply energy to thermal power plants.











![]() |
![]() |
![]() |
![]() |
![]() |
|
|---|---|---|---|---|---|
| Modell | FC50 | FC100 | FC200 | FC500 | FC1000 |
| Capacity per cycle / L | 60L | 100L | 200L | 500L | 1000L |
| Size / mm | 1150X1120X1390 | 2000X1200X1700 | 2300X1500X1800 | 3300X1800X2600 | 3700X2000X2850 |
| Power Supply | 220V/230V | 380V/415V | 1150X1120X1390 | 380V/415V | |
| Max Power / kW | 5kW | 10kW | 15kW | 25kW | 38kW |
| Rated Power / kW | 3kW | 4.5kW | 6kW | 12kW | 20kW |
| Loading Method | Manual | Lift | Lift | Lift | Lift |
| Weight / kg | 750kg | 1350kg | 1900kg | 3600kg | 5500kg |
| Contact Us | Contact Us | Contact Us | Contact Us | Contact Us |

> Massive volumes of biowaste are produced, accompanied by exorbitant collection fees. Keyword: 100$/day
> Massive volumes of biowaste are produced, accompanied by exorbitant collection fees. Keyword: 100$/day
> Massive volumes of biowaste are produced, accompanied by exorbitant collection fees. Keyword: 100$/day
> Massive volumes of biowaste are produced, accompanied by exorbitant collection fees. Keyword: 100$/day

> Massive volumes of biowaste are produced, accompanied by exorbitant collection fees. Keyword: 100$/day
> Massive volumes of biowaste are produced, accompanied by exorbitant collection fees. Keyword: 100$/day
> Massive volumes of biowaste are produced, accompanied by exorbitant collection fees. Keyword: 100$/day
> Massive volumes of biowaste are produced, accompanied by exorbitant collection fees. Keyword: 100$/day
Phone
0551-345565656
Address
Chongming Economic Develop-ment Zone, Shanghai
ERFRGRGT@.11COM
